This OTIC project (Ramp Bridge at MP 34.9, Liberty-Adrian Road Bridge at MP 41.1 and the Key Bridge at MP 60.8 over the turnpike) included replacing the bridge decks and abutment slabs, deck joints and bearings as well as installing fencing. Major work at the 34.9 structure included performing a micro-silica overlay and replacing bearings and joints. DGL personnel provided construction administration and quality inspection for construction phase.