BGSU chose DGL to perform a Boundary and Topographic Survey on a 50 acre parking lot. Topographic items included overhead and underground utility locations, drainage structures, parking lot, walkways and drive details, and surrounding roadway details.

The University re-developed this site, which is bounded by SR 64, I-75 and campus recreational facilities on two sides, to help beautify the campus’s easterly entrance. Site boundaries were determined to assure new construction did not encroach upon the State’s right of way.

BGSU High 004.jpg